The Task Exposure Indexv2026.Q3
Occupation · SOC 11-9021.00 · Job Zone 4

AI exposure: Construction Managers

Plan, direct, or coordinate, usually through subordinate supervisory personnel, activities concerned with the construction and maintenance of structures, facilities, and systems. Participate in the conceptual development of a construction project and oversee its organization, scheduling, budgeting, and implementation. Includes managers in specialized construction fields, such as carpentry or plumbing.

Reading this score

computed

37.1% of this occupation's weighted task load is exposed, which puts Construction Managers at the 65th percentile of 923 occupations. The capability is largely there. Its average task scores 2.6 out of 4 on what a current system can produce, and the frictions that hold other jobs in place are comparatively weak here.

What holds the line here is context. Across this occupation's 25 tasks it averages 2.16 out of 3, the highest of the five friction dimensions. In plain terms, the work depends on knowledge the model cannot hold. Much of this job runs on things that were never written down: what this particular organisation does, what happened last week, what the person across the table actually meant. That context is the barrier, and it erodes as systems are given more access.

The most exposed thing this job does is Apply for and obtain all necessary permits or licenses, at 73.3%. The least is Implement new or modified plans in response to delays, bad weather, or construction site..., at 6.7%. A gap of 66.7% between two parts of the same job is the reason this index publishes at task level. An occupation-wide number would have hidden both.

Within management occupations, this one is less exposed than the median of 41.4% across the group's 56 roles, with 42 scoring higher. Being in an exposed family does not make a particular job exposed, and the reverse holds too.

What would move this score. Of 25 tasks, 16 are currently banded exposed, 4 assisted and 5 untouched. For that distribution to shift materially would take cheaper ways to verify output, since the cost of checking is currently doing more to hold this work in place than the cost of producing it. The score is re-computed every quarter against a fresh capability reference, and the change is published rather than quietly applied.

Task by task

25 tasks, O*NET 31.0
TaskExposedAssistedUntouchedImportanceBand
Apply for and obtain all necessary permits or licenses.73.3%26.7%0.0%3.85exposed
Evaluate construction methods and determine cost-effectiveness of plans, using computer models.73.3%26.7%0.0%3.78exposed
Interpret and explain plans and contract terms to representatives of the owner or developer, including administrative staff, workers, or clients.66.7%33.3%0.0%4.05exposed
Prepare and submit budget estimates, progress reports, or cost tracking reports.60.0%40.0%0.0%4.40exposed
Perform, or contract others to perform, pre-building assessments, such as conceptual cost estimating, rough order of magnitude estimating, feasibility, or energy efficiency, environmental, and sustainability assessments.58.3%29.2%12.5%3.83exposed
Determine labor requirements for dispatching workers to construction sites.55.0%20.0%25.0%4.25exposed
Develop construction budgets to compare green and non-green construction alternatives, in terms of short-term costs, long-term costs, or environmental impacts.55.0%20.0%25.0%2.89exposed
Apply green building strategies to reduce energy costs or minimize carbon output or other sources of harm to the environment.55.0%20.0%25.0%2.87exposed
Requisition supplies or materials to complete construction projects.50.0%25.0%25.0%4.00exposed
Direct acquisition of land for construction projects.50.0%25.0%25.0%2.57exposed
Prepare contracts or negotiate revisions to contractual agreements with architects, consultants, clients, suppliers, or subcontractors.47.5%27.5%25.0%4.16exposed
Secure third-party verification from sources, such as Leadership in Energy Efficient Design (LEED), to ensure responsible design and building activities or to achieve favorable LEED ratings for building projects.40.0%35.0%25.0%3.20exposed
Inspect or review projects to monitor compliance with building and safety codes or other regulations.35.0%40.0%25.0%4.53assisted
Inspect or review projects to monitor compliance with environmental regulations.35.0%40.0%25.0%3.71assisted
Study job specifications to determine appropriate construction methods.30.0%20.0%50.0%4.15exposed
Develop or implement quality control programs.28.3%21.7%50.0%4.42exposed
Confer with supervisory personnel, owners, contractors, or design professionals to discuss and resolve matters, such as work procedures, complaints, or construction problems.26.7%23.3%50.0%4.20exposed
Implement training programs on environmentally responsible building topics to update employee skills and knowledge.26.7%23.3%50.0%3.06exposed
Plan, schedule, or coordinate construction project activities to meet deadlines.23.3%26.7%50.0%4.40assisted
Investigate damage, accidents, or delays at construction sites to ensure that proper construction procedures are being followed.16.7%33.3%50.0%4.05assisted
Develop or implement environmental protection programs.15.0%22.5%62.5%3.50untouched
Direct and supervise construction or related workers.13.3%11.7%75.0%4.35untouched
Plan, organize, or direct activities concerned with the construction or maintenance of structures, facilities, or systems.8.3%16.7%75.0%4.15untouched
Contract or oversee craft work, such as painting or plumbing.6.7%18.3%75.0%4.11untouched
Implement new or modified plans in response to delays, bad weather, or construction site emergencies.6.7%18.3%75.0%4.00untouched

Task text and importance ratings sourced from O*NET 31.0. Shares computed. The occupation score is the importance-weighted mean.

Where the score comes from

judged

Every task is scored through the standardised work activities it maps to. These are this occupation’s averages on the six rubric dimensions. Capability is what AI can do; the other five are what stands in the way.

DimensionMeanScale
Capability2.560-4
Embodiment0.580-3
Presence0.900-3
Accountability1.400-3
Context2.160-3
Verification cost1.640-3

What this means in practice

Where most of a role's weighted task load is exposed, the work that survives is usually the part of the job nobody wrote into the job description: deciding what should be produced rather than producing it, and being answerable for the result. The tasks lowest on this page are a better guide to where to spend your time than any general advice about the future of work.

Occupations either side of this one

The four closest scores in the same occupational family, then the four closest anywhere in the index.

Read this carefully. Exposure is not displacement. A high score means current AI systems can produce this work, not that anyone will stop paying a person to do it. Adoption depends on economics, regulation and inertia that this index deliberately does not model. How the score is built.